//my video /* Slider*/

Heavy-duty excavation

Our quipment digs deep into the earth, carving through rock to uncover rich copper deposits.

Industrial furnaces and refining equipment

We transform raw copper ore into high-purity metal ready for manufacturing.

Specialized handling and loading

Streamlined storage and transport, keeping materials moving efficiently through the warehouse.

Trucks and crew

We collaborate seamlessly in the field, showcasing dedication, teamwork, and strong work ethic on-site.

Trucks and crew

We collaborate seamlessly in the field, showcasing dedication, teamwork, and strong work ethic on-site.

People, Planet and Prosperity

Powering Global Industry Responsibly with High-Grade Minerals
See how we work with our people, investors and communities to build a cleaner future, while nurturing our environment.​
Find out what we do to enhance the health, well-being and education of employees and communities.
We commit to acting responsibly and ethically, observing the highest standards of governance. Learn about our approach, policies and standards.
We produce London Metal Exchange (LME) grade cobalt and copper cathode, critical for the renewable energy transition
MRR Mining has a track record of production and exploration success in the DRC and is currently advanced in its development of two world class assets which will collectively produce, at their peak, more than 75,000 tonnes of copper and 20,000 tonnes of cobalt hydroxide annually
MRR Mining’s operations are located in Haut-Katanga and Lualaba provinces, with the concessions that make up our pipeline located across the DRC.

"Operating in one of the world’s most prospective and under-explored mining regions, MRR Mining operates ethically, responsibly and with the interests of the local community, environment and the DRC at large at heart."

MRR Mining Chairman and MD Piere Mikidadi

Since inception, MRR Mining’s leadership motto has been to “Build Africa”.

Global Best Practise

MRR Mining is Proudly
ISO 14001:2015 Certified

MRR Mining is Proudly
ISO 45001:2018 Certified

MRR Mining is Proudly
ISO 9001:2015
Certified

Etoile Operations and Expansion Project

Established operation which has delivered over 275,000t of copper and 50,000t of cobalt hydroxide over last 20 years; advanced expansion project underway

Output Copper Cathodes
20,000 tpa
Capacity Cobalt content in hydroxide salt
3,000 tpa

Mutoshi Project

Globally significant advanced development project
Output Copper Cathodes
40,000 tpa
Capacity Cobalt content in hydroxide salt
13,000 tpa
Chat with us